Delivery Information: Please allow 3 to 5 business days for orders to be processed, plus standard transportation delivery time.   _______________________________________________________ 
  
  Split Kit includes the necessary parts required to engineer  a split in the row of panels. Typically used for panel obstruction  work-arounds to circumvent skylights, vents, chimneys, pipes, etc.  or when different size panels are combined.
  Also for use when a row of panels is split over two adjoining roof  surfaces; i.e. the panel row begins on a south-facing roof, and then  splits and continues onto a west roof. 
Complete Split Kit includes:  • 4 - CPVC* Panel Adapters; used for connecting to panel***          outlet  • 4 - 1.5"x2" PVC Reducer Bushings; used with Panel Adapter to          increase to 2" **** • 4 - PVC Couplings; used with Bushings to connect PVC         pipe together**  • 1 - Panel Kit [see below] 
Panel Kit includes:  • 2 - 3" Rubber Couplings; used for connecting the          panel headers together in a series***   • 5 - #32 Stainless Steel Hose Clamps; used for sealing          Rubber Couplings to panel headers***  • 4 - Header/Strap Stainless Steel Clips; used for fastening          panel and strap to roof or rack  • 4 - #14  1/4"x1.5"  3/8" Hex Head Stainless Steel Screws;†          used for fastening Stainless Steel Clips to roof 
  †Concrete Tile or Wood/Metal Rack applications include:  The appropriate screws are substituted for the Stainless Steel Screws above - based on the customer requirements that are  chosen in dropdown selection box at top of this page entitled "System Hardware Kit based on installation application" 
  • Shingle, Metal or Modified/Rolled Roofs or Pressure Treated  • Wood Frame Racks, use standard kit screws:          #14 - 1/4" x 2" - 3/8" Hex Head Stainless Steel Screws • Barrel or Flat Concrete Tile or Concrete Roofs, substitute:          #14 - 1/4" x 1 1/4" - 5/16" Tapcon Hex Head Screws • Aluminum or Steel Frame Racks, substitute:          #14 - 1/4" x 1" - 7/16" Hex Head Bolts and Locking Nuts
 
  Note: If two panel rows are installed one above the other  on the same or different roof, then order a Double Row Kit  instead of a Split Kit. 
 
  *CPVC withstands high temperatures and requires all-purpose CPVC glue. If PVC glue is used, it may result in leakage. ** Based on Plumbing size selected above ***Based on Panel Header size selected above ****Included only when selecting 1.5" Headers with 2" piping.
 
  _______________________________________________________ 
  HELP » Contact Customer Support • Toll-Free help line offering unit sizing support • Online e-mail technical and installation support • Brand and cost-of-operation comparisons
  _______________________________________________________
   
           |